Vertical and horizontal FFS lines for granules, powders, liquids and pastes. Built in 12 to 16 weeks. Quoted in Rand. Standard Festo, Siemens and SEW components — every spare is already in your country.
Since 1984. Building for Kelpack, Sovereign Foods, Irvin & Johnson, Royal Tea Packers, Natal Associated Chemicals.




Vertical Form, Fill & Seal (VFFS)
For granules, powders, snacks, animal feed, fertilizer, dry pet food.
Horizontal Form, Fill & Seal (HFFS)
For sachets, stick packs, single-serve formats.
Twin & single sachet machines
For spices, sugar sticks, sauce sachets, single-dose powders
Liquid fillers
For sauces, oils, pastes, detergents.
Custom collators
Collate and group bagged product downstream of the FFS.
Forming shoulders
Built to your bag width and film spec.
We build with standard, locally-available components - Festo pneumatics, Siemens PLCs, SEW drives. Every electrical schematic is clear, labelled, and in your language. When something breaks at 2am on a Sunday, your maintenance team can pull a part off the shelf and fix it. No air-freight wait. No vendor-locked controllers. No proprietary protocols.
Standard Festo pneumatic components
Standard Siemens PLC and HMI
Standard SEW geared motors
Open electrical schematics, labelled to spec
Local spares stocked in New Germany
Phone-up technical support direct to engineering

Lead times above reflect standard custom builds. Actual timing depends on product, packaging material, and units-per-hour. We need those three inputs to confirm a fixed lead time on your quote.
Imported, built in Europe
Order placed
Week 0
Build complete (ex-works)
Week 28
Freight to South Africa
+4 Weeks
Running on your line
+2 Weeks
TOTAL LEAD TIME
30–48 weeks
Built in New Germany
Spec Signed Off
Week 0
Build Complete
Week 10
Factory Acceptance Test
Week 11
Running on your Line
Week 12
TOTAL LEAD TIME
12 WEEKS

Send your spec on WhatsApp
Product, packaging material, units per hour. Photos of your existing line if you have them.

48-hour
quote
Refurb option, replacement option, parts list. Locked in Rand.

Spec
sign-off
We finalise mechanical, electrical and control drawings. You sign off.

Build
& FAT
Built in New Germany. You attend Factory Acceptance Test before despatch.

Install
& run
Delivered, installed, commissioned, and your operators trained on-site.
Every machine is custom. Common requests:
(If it's not on this list, ask. We've probably built it.)
Stainless steel construction (304 or 316 grade)
Wash-down rated for food and detergent applications
Metal detection integration upstream or downstream
Custom feed systems for unusual product
Weight-check and reject integration
Date and batch coding integration
Multi-format changeover (multiple bag sizes, one machine)
Nitrogen flush for shelf-life extension




12 weeks for a standard custom VFFS. 16 weeks for complex multi-format builds. Most refurbishments delivered in 4 to 6 weeks. We'll commit to a fixed date in writing on the quote.
Yes. We build to the same throughputs as Bosch, Ishida, Ilapak and Statec Binder equivalents - at a fraction of the Rand cost.
Send us a 200g sample and a packaging spec. We do bench tests in our factory before quoting.
Yes - full turnkey. Mechanical, electrical, controls, installation, commissioning and operator training.
12 months against faulty workmanship from despatch. Subject to scheduled servicing by a qualified technician. Money-back performance guarantee on all products if performance is not met (T&Cs apply).
We can arrange in-house finance and rent-to-own. Most customers arrange their own (Sasfin, Merchant West, WesBank) and we work with whichever provider you bring.
Your product. Your packaging material. Your throughput target.
We'll have a Rand-locked quote back to you in 48 hours.